Period Client Project Name Start Completion Contractor
2011~2009 Hanmac Teco Industry Co., Ltd.
Reinforced concrete construction during civil engineering work for the leachate treatment facility at Pegimru Landfill in Yulchon Industrial Complex 1
2011.11.21 2012.03.31 Geocon Co., Ltd.
2011~2009 Hanmac Teco Industry Co., Ltd.'
Earthworks during Yulchon Industrial Complex 1 designated stage 1 facility maintenance work (expansion of storm drains, etc.)
2011.11.21 2011.12.31 Geocon Co., Ltd.
2011~2009 Uniken Co., Ltd.
Uniquen Co., Ltd. Section 3 water blocking facility installation work
2011.11.17 2011.12.07 Goldenpow Co., Ltd.
2011~2009 Korea East-West Power Co., Ltd.
Composite barrier sheet installation work during the construction of Dangjin Thermal Power Plant 2nd treatment plant
2011.11.01 2013.07.31 Sambu Construction Co., Ltd.
2011~2009 Hanmac Teco Industry Co., Ltd.
Plastering, waterproofing, masonry/earthwork during Yulchon 1st Regional Industrial Complex designated stage 2 waste landfill construction construction
2011.11.01 2012.05.31 Geocon Co., Ltd.
2011~2009 Hanmac Teco Industry Co., Ltd.
Plastering, waterproofing, masonry/earthwork during Hanmac Teco Industrial Co., Ltd. Pyeongtaek upper earth cover construction (stage 2)
2011.08.03 2011.08.31 Geocon Co., Ltd.
2011~2009 Namhae Chemical Co., Ltd.
Repair work on water blocking facility on the west side of the plaster field
2011.07.04 2012.01.30 Goldenpow Co., Ltd.
2011~2009 Daegu Metropolitan City Construction Management Headquarters
Civil engineering water protection material construction during environmental resource facility (reclaim construction) construction
2011.06.20 2011.12.15 Haedong Construction Co., Ltd.
2011~2009 Hansol EME Co., Ltd.
Structures/earthworks during the Gunsan designated waste public treatment plant landfill facility (stage 5) installation project
2011.06.15 2011.10.10 Geocon Co., Ltd.
2011~2009 Dongyang Eco Co., Ltd.
Tongyang Eco Co., Ltd. Gyeongju Branch landfill site water protection work during installation work
2011.06.10 2011.08.10 Dongyang Construction Co., Ltd.
2011~2009 Dongyang Eco Co., Ltd.
Tongyang Eco Factory internal road paving and retaining wall installation work
2011.06.10 2011.08.10 Dongyang Construction Co., Ltd.
2011~2009 Green Viro Co., Ltd.
Plastering, waterproofing, masonry/earthwork during construction of landfill facility in areas 5 and 6 of Green Byro Co., Ltd.
2011.06.09 2012.04.10 Geocon Co., Ltd.
2011~2009 Geoje-si
Secondary construction (second part) during the Geoje City waste landfill facility installation (expansion) project
2011.05.11 2012.04.26 Euro Construction Co., Ltd.
2011~2009 Hanmac Teco Industry Co., Ltd.
Hanmac Teco Industrial Co., Ltd. Pyeongtaek designated landfill site upper part final covering construction, plastering, waterproofing, masonry work
2011.05.03 2011.05.31 Geocon Co., Ltd.
2011~2009 Hanmac Teco Industry Co., Ltd.
Plastering, waterproofing, masonry work during waste landfill embankment installation work in the first stage of Yulchon 1st local industrial complex designation
2011.05.03 2011.06.30 Geocon Co., Ltd.