Waste Landfill 26

본문 바로가기

Waste Landfill

Waste Landfill 26

Waste Landfill 26

Waste Landfill list
Period Client Project Name Start Completion Contractor
2011~2009 Koentech Co., Ltd.
Koentech Co., Ltd. Landfill Site 1 Final Covering Construction
2009.08.17 2010.06.30 Ilgwang Industry Co., Ltd.
2011~2009 POSCO Co., Ltd.
(Gwangyang) raw material pier dredged soil dump site construction work, water re-laying work
2009.08.03 2010.03.15 Changil Construction Co., Ltd.
2011~2009 Youngpoong Co., Ltd.
1st and 3rd sedimentation reservoir CORVERING construction
2009.06.10 2009.07.03 Goldenpow Co., Ltd.
2011~2009 Green Viro Co., Ltd.
Earthworks during the Pohang 4 General Regional Industrial Complex Phase 2 waste landfill construction project
2009.06.02 2010.01.31 Geocon Co., Ltd.
2011~2009 ESTI Co., Ltd.
EST Co., Ltd. business site waste landfill facility 4th landfill temporary slope protection installation work
2009.04.01 2009.04.10 Goldenpow Co., Ltd.
2011~2009 Ecosystem Co., Ltd.
Structure/drainage work during Ecosystem Waste Disposal (Landfill Facility) Construction (Area B)
2009.03.24 2010.07.31 Yeongdong Construction Co., Ltd.
2011~2009 Sokcho-si
Water barrier construction during waste landfill facility (infrastructure) construction project 4
2009.03.18 2009.04.01 Dongil Construction Co., Ltd.
2011~2009 EST Co., Ltd.
EST Co., Ltd. waste landfill facility secondary landfill underground water collection well expansion construction
2009.03.17 2009.04.01 Goldenpow Co., Ltd.
2011~2009 Hanmac Teco Industry Co., Ltd.
Hanmac Teco Industrial Co., Ltd.-designated outer shell reinforcement embankment and iron concrete/earthwork during general section 1-2 final cover earthwork
2009.03.06 2009.04.30 Geocon Co., Ltd.
2011~2009 Jeju City
Udo-myeon landfill site barrier repair work
2009.03.04 2009.03.23 Goldenpow Co., Ltd.
2011~2009 Dongyang Eco Co., Ltd.
#10-3,4 Landfill Separation Embankment Sheet Laying and Groundwater Exclusion Collection Sheet Installation Work
2009.02.01 2009.02.15 Dongyang Construction Co., Ltd.
2008 Before Wonkwang InVirotech Co., Ltd.
Dangjin Wonkwang Ancient District Waste Landfill Final Covering Facility Construction
2008.12.24 2010.12.15 Geocon Co., Ltd.
2008 Before Hanmac Teco Industry Co., Ltd.
Hanmac Teco Industrial Co., Ltd. Yulchon 1st Regional Industrial Complex Designated Waste Landfill Site Construction Project, Plastering/Iron Cone/Earthwork
2008.12.24 2009.02.20 Geocon Co., Ltd.
2008 Before Youngpoong Seokpo Refinery Co., Ltd.
Onsan mine loading dock metlining waterproofing work
2008.12.01 2008.12.10 Goldenpow Co., Ltd.
2008 Before EST Co., Ltd.
EST Co., Ltd. business site waste landfill facility construction project (2nd section, 2nd stage embankment elevation construction)
2008.11.05 2009.01.31 Goldenpow Co., Ltd.